| RAW MATERIAL | PP/PE Melt Lumps |
|---|---|
| CAPACITY | 500KG/H |
| OPERATION | FULL AUTOMATIC |
| TOTAL POWER | 110KW |
| CRUSHING WAY | SHREDDER SINGLE SHAFT |
| Product Name | PVC Pipe Extrusion Line |
|---|---|
| Condition | New Generation |
| Voltage | As Cutomer's Condition |
| Screw Design | Twin Screw |
| Temperature Control | Omron |
| RAW MATERIAL | PP/PE Melt Lumps |
|---|---|
| CAPACITY | 500KG/H |
| OPERATION | FULL AUTOMATIC |
| TOTAL POWER | 110KW |
| CRUSHING WAY | SHREDDER SINGLE SHAFT |
| Name | PVC Pipe Extrusion Line |
|---|---|
| Packaging Details | Film Wraping |
| Plastic | PVC |
| Application | Pipe Making |
| Raw Material | Pvc Powder |
| RAW MATERIAL | PP/PE Melt Lumps |
|---|---|
| CAPACITY | 500KG/H |
| OPERATION | FULL AUTOMATIC |
| TOTAL POWER | 110KW |
| CRUSHING WAY | SHREDDER SINGLE SHAFT |
| Packaging Details | STANDARD PACKAGE |
|---|---|
| Delivery Time | 45 WOKING DAYS |
| Payment Terms | L/C,T/T |
| Supply Ability | 15 SETS PER MONTHS |
| Place of Origin | ZHANGJIAGANG |
| Packaging Details | STANDARD PACKAGE |
|---|---|
| Delivery Time | 45 WOKING DAYS |
| Payment Terms | L/C,T/T |
| Supply Ability | 15 SETS PER MONTHS |
| Place of Origin | ZHANGJIAGANG |
| Packaging Details | STANDARD PACKAGE |
|---|---|
| Delivery Time | 45 WOKING DAYS |
| Payment Terms | L/C,T/T |
| Supply Ability | 15 SETS PER MONTHS |
| Place of Origin | ZHANGJIAGANG |
| Frame Wide | 300mm Wide |
|---|---|
| Rame Thickness | 100mm |
| RAW MATERIAL | PVC & ADDITIVES |
| Inverter | ABB |
| Main Motor SIEMENS BEIDE Motor | BEIDE Motor |
| Production Name | PPR Glassfiber PPR Pipe Production Machine |
|---|---|
| Pipe Size | 20-63mm; 3 Layer |
| Extruder Capacity | 350kgs/h For Inner &outer +180kgs/h Middle GF |
| Die Head | 3 Layer Co-extrusion With Two Extruders |
| Production Speed | 12m/min; 20m/min; 28m/min |